Identifikasi Sisa Material Konstruksi Pada Proyek Pembangunan Pelabuhan (Studi Kasus: Pengembangan Pelabuhan Tengkayu 1 Tahap 5 Kota Tarakan)

Muhamad Yusrizal, Budi Setiawan

Abstract


ABSTRACT: Construction project activity is a long process, in its implementation many problems and obstacles are encountered. One of them is the problem of residual material which is a serious problem in the implementation of construction projects. Efforts to minimize waste of construction materials will help increase profits and reduce environmental impact. Based on these problems, it is necessary to conduct research on materials that have the potential to become residual materials. Data collection was obtained from the company administration to support the calculation. Data processing begins with classifying material types, identifying potentially waste material with pareto analysis, calculating waste volume, calculating waste level, ranking potentially waste material based on waste level, calculating waste cost, ranking potentially waste material based on waste cost, structured interviews with respondents . From the results of material analysis, the remaining construction materials for the Port Development Project (Case Study: Development of Tengkayu Port 1 Phase 5, Tarakan City), are 5 mm dark blue glass, galvanized 5", 60x60 cm granite, ACP cover, 0.6 mm solar flat roof, aluminum sills 4", 10 mm plate, steel Ø 4 " (114.3 mm) t = 4.5 mm, iron pipe 10 " (267.44 mm) t = 6.6 mm, iron D16, iron D12. The material that has the highest volume and cost is 5 mm dark blue glass with a total waste cost of Rp. 101,399,197.87.

Keywords: Identification, Construction, Material

 

ABSTRAK: Kegiatan proyek konstruksi merupakan suatu proses yang panjang, dalam pelaksanaannya banyak dijumpai masalah dan kendala. Salah satunya permasalahan sisa material yang merupakan salah satu masalah serius pada pelaksanaan proyek konstruksi. Usaha meminimalkan sisa material konstruksi akan membantu meningatkan keuntungan dan mengurangi dampak lingkungan. Berdasarkan permasalahan tersebut perlu dilakukan penelitian terhadap material yang berpotensi menjadi sisa material. Pengumpulan data diperoleh dari pihak administrasi perusahaan untuk menunjang perhitungan. Pengolahan data diawali dengan menglompokkan jenis material, mengidentifikasi material yang berpotensi waste dengan analisa pareto, menghitung volume waste, menghitung waste level, merangking material yang berpotensi waste berdasarkan waste level, menghitung waste cost, merangking material berpotensi waste berdasarkan waste cost, wawancara terstruktur terhadap responden. Dari hasil analisa material yang menjadi sisa material konstruksi pada Proyek Pembangunan Pelabuhan (Studi Kasus: Pengembangan Pelabuhan Tengkayu 1 Tahap 5 Kota Tarakan), adalah kaca dark blue 5 mm, galvanize 5", granito 60x60 cm, cover ACP, atap solarflat 0.6 mm, kusen aluminium 4", plat 10 mm, besi Ø 4 " (114.3 mm) t = 4.5 mm, besi pipa 10 " (267.44 mm) t = 6.6 mm, besi D16, besi D12. Dengan material yang memiliki volume dan biaya tertinggi adalah kaca dark blue 5 mm dengan total waste cost sebesar Rp. 101.399.197,87.

Kata kunci: Identifikasi, Konstruksi, Material


Full Text:

PDF 117-126

References


Branz. 2002. Easy Guide to Reducing Construstion Waste. New Zealand.

Gavilan, R. M., dan Bernold, L. E. (1994). Source Evaluation of Solid Waste In Building Construction. Journal of Construction Engineering and Management, 541-542.

Kusuma, Valentino Arya. 2010. Evaluasi Sisa Material Pada Proyek Gedung Pendidikan Dan Laboratorium 8 Lantai Fakultas Kedokteran Uns Tahap 1. Skripsi, Universitas Sebelas Maret.

Loosemore, M., and Teo, M.M.M. (2001). A Theory of waste behaviour in the construction industry, Journal construction management and economics.

Perdana, A.S, Indrayadi, M, Dan Pratiwi, R. 2017. Identifikasi Construction Material Waste Pada Proyek Pembangunan Gedung (Studi Kasus : Rumah Jabatan Rektor Untan Pontianak). Artikel ilmiah, Universitas Tanjungpura Pontianak.

Sapitri, Firdaus. 2019. Waste Konstruksi: Identifikasi Potensi dan Penyebabnya Pada Proyek Perumahan Di Pekanbaru. Jurnal Saintis. Volume 19 Nomor 2 (79-88).

Skoyles, E.F. 1976. Material wastage: A misuse of resources, Building, Research and Practice.

Stuckhart, George. 1995. Construction Materials Management, Marcel Dekker,Inc.

Sugiyarto, Hartono, W, Dan Prakoso, I.T. 2017. Analisis Dan Identifikasi Sisa Material Kontruksi Dalam Proyek Pembangunan Dan Peningkatan Jalan Solo-Gemolong-Geyer Bts, Kab.Sragen. e-Jurnal MATRIKS TEKNIK SIPIL, 070-1077.

Widhiawati, I.A.R, Astana, N.Y, & Indrayani, N.L.A. 2019. Kajian Pengelolaan Limbah Konstruksi Pada Proyek Pembangunan Gedung Di Bali. Jurnal Ilmiah Teknik Sipil, 23, 1.

Wiguna, P.A, Rahmawati, F, Dan Haposan, J. 2009. Identifikasi Material Waste Pada Proyek Konstruksi (Studi Kasus Ruko San Diego Pakuwon City Surabaya). Seminar Nasional Aplikasi Teknologi Prasarana Wilayah




DOI: https://doi.org/10.35334/cesj.v2i2.3388

Refbacks

  • There are currently no refbacks.


Alamat Redaksi
Program Studi Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan
Jl. Amal Lama No.1 Kota Tarakan Kalimantan Utara
Hp. 081233242398, Tlp. 08115309459, Fax: 0551-2052558
E-mail: borneo.cesj@gmail.com

Civil Engineering Scientific Journal Index By:

 

 

Â