ANALISIS KETERSEDIAAN DAN KEBUTUHAN AIR BAKU PADA EMBUNG SUNGAI BILAL KABUPATEN NUNUKAN MENGGUNAKAN METODE F.J. MOCK

Nurdiansyah Nurdiansyah, Rahmat Faizal, Aswar Amiruddin

Abstract


ABSTRACT : Due to population growth and the region's fast development, domestic and non- domestic water consumption has grown in Nunukan Regency. To meet the clean water demand, the government has built the Bilal River Reservoir, which initiated a study of the Bilal River Reservoir to be carried out to determine the reservoir's reliability in meeting the demand for clean water in line with population growth. This study analyzed water availability and the demand for raw water in the Bilal River Reservoir. In the analysis of water availability, the Modified Penman approach is used to analyze evapotranspiration, while the F.J. Mock method was used to study effective debit. From the analysis of raw water availability using the F.J. Mock with 90% reliability, The biggest Q90 was in January at 119 liters/sec, and the smallest was in December at 15 liters/sec. As well as the results of the largest water demand analysis in 2031 in the West Nunukan Village zone of 19,947 liters/sec and the smallest in 2022 in the Central Nunukan Village zone of 6,249 l/s.

Keywords: Bilal River Reservoir, Water Availability, Water Demand, F.J. Method Mock 

ABSTRAK: Meningkatnya aktivitas penduduk ditambah dengan berkembangnya pembangunan yang semakin pesat menyebabkan kebutuhan air untuk domestik maupun non domestik yang meningkat di Kabuapten Nunukan. Dalam rangka upaya pemenuhan kebutuhan air bersih, pemerintah Kabupaten Nunukan membangun Embung Sungai Bilal. Kajian terhadap Embung Sungai Bilal perlu dilakukan untuk mengetahui keandalan embung dalam memenuhi kebutuhan air bersih sejalan dengan pertumbuhan penduduk. Penelitian ini bertujuan untuk menganalisis ketersediaan air dan kebutuhan air baku pada Embung Sungai Bilal. Pada analisis ketersediaan air perhitungan Evapotranspirasi menggunakan metode Penman Modifikasi dan Debit Efektif menggunakan metode F.J. Mock. Dari hasil analisis ketersediaan air baku dengan menggunakan metode F.J. Mock dengan keandalan 90%. Q90 terbesar pada bulan Januari sebesar 119 ltr/dtk terkecil pada bulan Desember sebesar 15 ltr/dtk. Serta hasil analisis kebutuhan air terbesar pada tahun 2031 zona Kelurahan Nunukan Barat sebesar 19,947 lt/dtk, terkecil pada tahun 2022 zona Kelurahan Nunukan Tengah sebesar 6,249 lt/dtk.

Kata kunci: Embung Sungai Bilal, Ketersediaan Air, Kebutuhan Air, Metode F.J. Mock

Full Text:

PDF 71-83

References


Chairani, Risky. (2019). Analisis Ketersediaan Air Dengan Metode F.J. Mock Pada Daerah Aliran Sungai Babura. Skripsi. Teknik Lingkungan, Universitas Sumatera Utara.

Dwi, Oktaviani. (2017). Estimasi Analisis Ketersediaan Air Pada Embung Sei Bolong Persemaian Kabupaten Nunukan. Jurusan Teknik Sipil, Universitas Borneo Tarakan

Faizal, R., Firdaus, W., Amiruddin, A., 2023. Analisis Kebutuhan dan Ketersediaan Air Baku Embung Bolong Kabupaten Nunukan Menggunakan Metode NRECA. Civil Engineering Scientific Journal. 2 (2) .Universitas Borneo Tarakan

Kaka, Venansius Zeingo. (2020). Analisis Debit Andalan Pada Derah Irigasi Konga Dengan Menggunakan Metode Nreca dan Metode F.J Mock. Teknik Sipil, FST, UNDANA

Lukman, H, L., & Hardilasari. 2020. Tinjauan Analisis Ketersediaan Air untuk Pemenuhan Kebutuhan Air Bersih di Kampus Ma’Had Al-Birr Universitas Muhammadiyah Makassar. Skripsi. Jurusan Sipil Pengairan. Universitas Muhammadiyah Makassar.

Mock, F.J., (1973). Land Capability Appraisal Indonesia. Water Avaibility Apprasial, Report Prepared for the Land Capability Apprasal Project, Bogor-Indonesia.

Pertami, Sutika Surya Indah. (2021). Analisis Kebutuhan dan Ketersediaan Air Bersih IPA Kampung Bugis PDAM Kota Tarakan Dengan Menggunakan Metode Nreca Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Riani, S., Dewanti, A, N., & Prasaningtyas, A., (2020). Analisis Kebutuhan Air Baku Kecamatan Samboja Tahun 2020. Perencanaan Wilayah dan Kota, Balikpapan, Indonesia.

Sari, Ulfa. (2020). Analisis Ketersediaaan Air Baku Pada Embung Binalatung Berdasarkan Kajian Hidrologi. Jurusan Teknik Sipil, Universitas Borneo Tarakan

Triatmodjo, Bambang. (2008). Hidrologi Terapan. Yogyakarta : Beta Offset.


Refbacks

  • There are currently no refbacks.


Published By :

Civil Engineering Department, Faculty of Engineering, University of Borneo Tarakan

Jl. Amal Lama No 1, Tarakan 77115, Indonesia
E-Mail : borneo.cesj@gmail.com
Web : http://jurnal.borneo.ac.id/index.php/CESJ/index
Telp : 081233242398 Faks. (0551) 2052558

All publications

by Civil Engineering Scientific Journal

are licensed under a
Creative Commons Attribution-ShareAlike 4.0 International License.