Identifikasi Faktor Yang Mempengaruhi Besaran Biaya Dalam Pelaksanaan Proyek Skala Kecil Di Bali

Ida Ayu Cri Vinantya Laksmi, I Wayan Jawat, I Gusti Agung Gede Nodya Dharmastika

Abstract


The realization of the implementation of a project must be within the initial project planning stage. In the planning stage, various types of activities are carried out, starting from forming the project team, preparing the schedule, planning project resources, and preparing project cost estimates. Cost estimation activities are one of the main processes in a construction project to determine the amount of funds that must be provided for a building. Without costs, the project will not be able to be implemented even if other resource elements are met. Costs in construction projects consist of direct costs and indirect costs. Based on these 2 (two) types of costs, research needs to be carried out to determine the factors that influence the nominal amount of these types. Data analysis in this research uses the Analytical Hierarchy Process (AHP) method. The results of the research show that the order of factors that have the most influence on the two types of costs include force majeure factors, availability of labor, detailed design plans, work methods, technical specifications, distance to the place where materials/tools are purchased, location of work/project, the environment around the project, and road conditions leading to the project.

Keywords


Identification, costs, construction projects, Bali

Full Text:

PDF

References


Asja, M. A. (2013). Pengantar Penggunaan AHP (Analytical Hierarchy Process) dalam Pengambilan Keputusan. Dipetik December 14, 2017, dari http://mawardisyana.blogspot.co.id/2013/04/pengantar-penggunaan-ahp-analytical.html

Deri Afriza Saputra, Rian Tri Komara Iriana, & Mardani Sebayang. (2018). ANALISIS FAKTOR DOMINAN PENYEBAB TERJADINYA PEMBENGKAKAN BIAYA (COST OVERRUN) PADA PROYEK KONSTRUKSI GEDUNG PEMERINTAH DI KOTA PEKANBARU. Jurnal Online Mahasiswa FTEKNIK Volume 5 No.1, 1-8.

Dwiyanto, G. E. (2020). Analisis Estimasi Biaya dengan Metode Cost Significant Model pada Konstruksi Jembatan Rangka Baja di Provinsi Sulawesi Selatan. Makassar: Universitas Hasanuddin.

Eman, P. A., Lintong, E., & Jansen, F. (2018). Estimasi Biaya Konstruksi Menggunakan Metode Parameter Pada Proyek Pemeliharaan Berkala Jalan Di Kota Manado. Jurnal Ilmiah Media Engineering Vol.8 No.2, 1033.

Fahadila, F. (2017). KAJIAN FAKTOR PENYEBAB COST OVERRUN PADA PROYEK KONSTRUKSI GEDUNG. Jurnal Teknik Mesin (JTM) Vol 6, No 2, 94-101.

Indrawan, G. (2011). Estimasi Biaya Pemeliharaan Jalan dengan â€Cost Significant Model†Studi Kasus Pemeliharaan Jalan Kabupaten di Kabupaten Jembrana. Denpasar: Teknik Sipil Universitas Udayana.

Jason, C., & Waty, M. (2021). IDENTIFIKASI FAKTOR PENYEBAB COST OVERRUN (PEMBENGKAKAN BIAYA) PADA PROYEK RUMAH TINGGAL. JMTS: Jurnal Mitra Teknik Sipil, Vol. 4, No. 3, 633-640.

Laksmi, I. A. (2019). Faktor Sukses Penerbitan IMB di Kabupaten Gianyar, Bali. Jurnal Spektran Vol. 7, No 2, 195-203.

Laksmi, I. C., Jawat, I., & Armaeni, N. (2021). Faktor Pembengkakan Biaya Proyek Selama Pandemi Covid-19 Pada Kontraktor Skala Kecil di Bali. FROPIL (Forum Profesional Teknik Sipil) (Vol. 9 No. 2), 78-85.

Laksmi, I. V. (2022). Faktor dan Metode Estimasi Biaya Proyek Selama Masa Pandemi Covid-19 Pada Pelaksana Jasa Konstruksi Skala Kecil di Bali. Denpasar: Lembaga Penelitian Universitas Warmadewa.

Pandey, Raymond D, & et al. (2012). Analisis Faktor Penyebab Pembengkakan Biaya (Cost Overrun) Peralatan Pada Proyek Konstruksi Dermaga Di Sulawesi Utara. Jurnal Ilmiah Media Engineering, vol. 2, no. 3, 2012, 153-162.

Saaty, T. L. (1993). Pengambilan Keputusan Bagi Para Pemimpin, Proses. Hirarki Analitik untuk Pengambilan Keputusan dalam Situasi yang Kompleks. Jakarta: Pustaka Binama Pressindo.

Sahusilawane, T., Bisri , M., & Rachmansyah, A. (2012). Analisis Faktor-Faktor Penyebab Terjadinya Pembengkakan Biaya (Cost Overrun) pada Proyek Konstruksi Gedung di Kota Ambon. Rekayasa Sipil, [S.l.], v. 5, n. 2, 118-128.

Sari, M. M., Hadi, T. S., & Aldiansyah. (2020). FAKTOR PENYEBAB PEMBENGKAKAN BIAYA YANG BERPENGARUH TERHADAP BIAYA AKHIR PADA PROYEK KONSTRUKSI GEDUNG. Jurnal Infrastruktur 6 (1), 59-67.

Sean A.M.Pebakirang, Agung Sutrisno, & Johan Neyland. (2017). PENERAPAN METODE AHP (ANALYTICAL HIERARCHY PROCESS) UNTUK PEMILIHAN SUPPLIER SUKU CADANG DI PLTD BITUNG. Jurnal Online Poros Teknik Mesin Volume 6 Nomor 1 , 32-44.

Suanda, B. (2017). Advanced and Effective Project Management Jilid 1. Jakarta: PT PP (Persero) Tbk.

Sumadi, I. E., Wiranata, A., & Asmara, A. A. (2016). Analisis Faktor Yang Mempengaruhi Pebengkakan Biaya Konstruksi (Cost Overrun) Dengan Metode Analytical Hierarchy Process (AHP) Pada Proyek Konstruksi Di Kota Denpasar dan Kabupaten Badung. JURNAL ILMIAH TEKNIK SIPIL • A SCIENTIFIC JOURNAL OF CIVIL ENGINEERING Vol. 20 No. 1  Januari 2016, 66-71.




DOI: https://doi.org/10.35334/be.v7i3.4548

Copyright (c) 2024 Borneo Engineering : Jurnal Teknik Sipil

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Published By :

Civil Engineering Department, Faculty of Engineering, University of Borneo Tarakan

Jl. Amal Lama No 1, Tarakan 77115, Indonesia
E-Mail : bejts@borneo.ac.id
Web : http://jurnal.borneo.ac.id/index.php/borneoengineering
Telp : 087704518570 Faks. (0551) 2052558

All publications

by Borneo Engineering: Jurnal Teknik Sipil

are licensed under a
Creative Commons Attribution-ShareAlike 4.0 International License.

Borneo Engineering Indexed By:

GARUDA

 

 

 

Web Analytics

View My Stats