Scheduling Analysis on the Heavy Rehabilitation Construction Project of the Dr. R. Koesma Tuban Hospital Building Using the PERT Method
Abstract
Project scheduling is a key factor in achieving successful implementation as planned. Constraints such as limited resources, improper reporting, and high costs often become challenges in project management. Delays in project completion are very detrimental both in terms of cost and time. Just like what happened in the Rehabilitation and Heavy Construction Project of the Outpatient and Administration Building at Dr. R. Koesma Regional General Hospital in Tuban Regency, there was a delay of 10 days in its implementation. This research aims to determine the duration of the rehabilitation of the dr. R. Koesma Hospital building in Tuban Regency using the PERT method to improve time efficiency, reduce the risk of delays, and ensure overall project success. The research method used is combining two approaches, PERT method (Program Evaluation and Review Technique) to calculate the expected duration estimation of each work, and Microsoft Project 2016 to compile a project schedule that allows identification of critical activities and work network analysis. The results of the analysis using PERT method and Microsoft Project 2016 showed that the project was estimated to be completed in 115 days, faster than the planned 133 days. The probability that the project will be completed within the planned target duration T(d) = 133 days is 99.9%. Hence, there is a high probability that the project will be completed on time.
Keywords
Full Text:
PDFReferences
Abraham, I. J., Ridwan, A., dan Suwarno, S, 2022, Percepatan Waktu Pelaksanaan Pembangunan Gedung Rumah Sakit Aisyiyah Kabupaten Ponorogo Menggunakan Metode PERT (Program Evaluation and Review Technique), Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS), 5(1), 89-103.
Akbar, S. R. A. A., dan Setiawan, E, 2023, Analisis Network Diagram dengan Metode CPM dan PERT pada Project Pekerjaan Pemasangan Komponen Kelistrikan Kereta Listrik Makasar Pare-Pare, Prosiding Simposium Nasional Rekayasa Aplikasi Perancangan dan Industri, 98-108.
Andardi, F. R, 2021, Analisis Penerapan Sistem Penjadwalan Dengan Metode Pert Pada Proyek Konstruksi (Studi Kasus: Rehabilitasi Dan Peningkatan Infrastruksi Pasar Tradisonal Kota Malang), Prokons Jurusan Teknik Sipil, 14(2), 19.
Al Ghifari, M. A., dan Djuanda, G, 2023, Optimasi Pembangunan Tangki Air Tanah dan Sanitasi Menggunakan Metode Program Evaluation and Review Technique (PERT) dan Critical Path Metode (CPM) Agar Efektif Biaya Dan Waktu, ARBITRASE: Journal of Economics and Accounting, 3(3), 687-692.
Erkles, C., Pratasis, P. A., dan Dundu, A. K, 2023 , Analisis Waktu Pada Proyek Pembangunan Gedung Kearsipan Universitas Sam Ratulangi Dengan Menggunakan Metode PERT, TEKNO, 21(86), 1887-1895.
Rozy, A. F., dan Ode, R. G. W, 2014, Manajemen Waktu, Biaya Dan Sdm Proyek Konstruksi Pada Pembangunan Gedung Ruang Kuliah Fia Universitas Brawijaya Malang Dengan Menggunakan Metode PERT Dan PDM. Media Teknik Sipil, 12(1).
Hendriyani, I., Kencanawati, M., dan Darmawan, M. V,2023, Penerapan Metode Cpm Dan Pert Pada Penjadwalan Proyek Pemasangan Pipa Di Perumahan Graha Wiyata Asri Balikpapan: Application Of CPM And PERT Methods In Residential Pipe Installation Project Scheduling In Graha Wiyata Asri Balikpapan, Jurnal Ilmiah Teknik Sipil TRANSUKMA, 5(3), 236-242.
Iluk, T., Ridwan, A., dan Winarto, S, 2020, Penerapan Metode CPM Dan PERT Pada Gedung Parkir 3 Lantai Grand Panglima Polim Kediri, J. Manaj. Teknol. Tek. Sipil, 3(2), 162-176.
Masinambow, J, 2019, Penjadwalan Pembangunan Menara Alfa Omega Di Kota Tomohon Dengan Menggunakan Metode Pert (Program Evaluation And Review Technique), Jurnal Ilmiah Realtech, 15(2), 121-128.
Maslina, M., Pratiwi, R., dan Ridho, A. M, 2023, Analisis Penjadwalan Proyek Rehabilitasi Jalan Preservasi Jalan Kerang €“Kuaro Kalimantan Timur Menggunakan Metode Pdm Dan Pert: Scheduling Analysis Of The Rehabilitation Project Preservation Road Kerang Road €“Kuaro East Kalimantan Using PDM And PERT Methods, Jurnal Ilmiah Teknik Sipil TRANSUKMA, 5(2), 94-104.
Julian, D. M., Sutrisno, S., dan Basri, A. A, 2023, Penerapan Metode CPM dan PERT pada Proyek Pembangunan Drainase di Perum Cengkong guna Mempercepat Waktu Penyelesaian (Studi Kasus: CV XYZ). Jurnal Serambi Engineering, 8(1).
Ramadhan, T., dan Sugiyono, S, 2019, Analisis Optimalisasi Proyek dengan Menggunakan Metode Pert. Indikator, 3(2), 353491.
Setiawati, S., & Syahrizal, R. A. D, 2017, Penerapan metode CPM Dan PERT pada penjadwalan proyek konstruksi (Studi kasus: Rehabilitasi/perbaikan dan peningkatan infrastruktur irigasi daerah Lintas Kabupaten/Kota DI Pekan Dolok), Jurnal Teknik Sipil USU, 6(1), 1-15.
Sholeh, M. N, 2020, Modul Pelatihan Microsoft Project 2019, Universitas Diponegoro.
Taranau, A. I., & Tjendani, H. T, 2023, Analisis Penjadwalan Pekerjaan Saluran Drainase Jalan Lintas Selatan Lot. 6 Kabupaten Tulungagung Dengan Metode PERT, Jurnal Taguchi: Jurnal Ilmiah Teknik dan Manajemen Industri, 3(1), 501-514.
DOI: https://doi.org/10.35334/be.v8i1.4977
Copyright (c) 2024 Borneo Engineering : Jurnal Teknik Sipil
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Published By : Civil Engineering Department, Faculty of Engineering, University of Borneo Tarakan Jl. Amal Lama No 1, Tarakan 77115, Indonesia | All publications by Borneo Engineering: Jurnal Teknik Sipil are licensed under a |
Borneo Engineering Indexed By: