Perancangan Instalasi Penerangan Pada Gedung Laboratorium Dan Perkuliahan Terpadu Universitas Borneo Tarakan
Abstract
The design of the lighting installation in the Integrated Lecture and Laboratory Building of the University of Borneo Tarakan. Generates a total power of about 31,048 KW with MCCB capacity on the main panel of 150 A. In this building is divided into 3 floors (1, 2 and Top Floor). Each group has its respective power (18,400, 12,328 and 320 Watt) and the nominal currents of each group are (35, 35, and 2 Ampere). The resulting stress loss is 0.4%
Keywords
Electricity, Lighting Installation
Full Text:
PDFDOI: https://doi.org/10.35334/jeb.v7i1.2108
Refbacks
- There are currently no refbacks.
Address: Gedung D Lt. 3 Kampus Universitas Borneo Tarakan. Jl. Amal Lama No. 1, Tarakan, Kalimantan Utara, Indonesia. Kodepos: 77123. Email:elektrika@borneo.ac.id
| All Publications by JEB (Jurnal Elektrika Borneo) are licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License |