PENILAIAN RISIKO BENDUNGAN TILONG BERBASIS METODE INDEKS RISIKO

Hotma Lamtio Purba, Sukamta Sukamta, Kresno Wikan Sadono

Abstract


Risk assessment aims to identify risks that may occur in various conditions, so that the necessary action plan can be carried out if the risk is unacceptable. In this study, the value of safety level in Tilong Dam, located at Kupang Regency, NTT is calculated.  The method used in this research is the risk index method. The method is based on a combination of importance of a dam factors, relative importance of physical conditions, and current condition from inspection. The result of this study shows that Tilong Dam has an importance of a dam factors (Idam) was 630, the total index risk was 116,55, and the safety level was 81,5. Tilong dam could be classified as satisfactory condition (safety level>75), so that no action plan is needed because it is categorized as safe under normal and extraordinary load conditions.


Keywords


Tilong Dam; Dam Safety; Risk Assessment; Risk Index Method

Full Text:

PDF


DOI: https://doi.org/10.35334/be.v1i1.3003

Copyright (c) 2023 Borneo Engineering : Jurnal Teknik Sipil

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Published By :

Civil Engineering Department, Faculty of Engineering, University of Borneo Tarakan

Jl. Amal Lama No 1, Tarakan 77115, Indonesia
E-Mail : bejts@borneo.ac.id
Web : http://jurnal.borneo.ac.id/index.php/borneoengineering
Telp : 087704518570 Faks. (0551) 2052558

All publications

by Borneo Engineering: Jurnal Teknik Sipil

are licensed under a
Creative Commons Attribution-ShareAlike 4.0 International License.

Borneo Engineering Indexed By:

GARUDA

 

 

 

Web Analytics

View My Stats